開山空壓機的運用者們必定有[You]遇[Yu]到過主機或電機過載而[Er]停機的問題,不要擔憂,鞍山市興盛空壓機(Ji)有限公司為你們分[Fen]憂解難。
The operators of Kaishan Air Compressor must have encountered the problem of the main engine or motor overload and shutdown. Don't worry, Anshan Xingsheng Air Compressor Co., Ltd. will share your worries and solve your difficulties.
一[Yi]、電[Dian]壓太低:
First, the voltage is too low:
一般的開山空壓[Ya]機額外工作(Zuo)壓力[Li]為380V,上下答應(Ying)起浮在[Zai]5%左右。這裡(Li)所說的電壓是機器正常工(Gong)作(Zuo)的電壓,因為許多工地上(工廠(Chang)電壓供給[Gei]比較(Jiao)安(An)穩一般不會[Hui]有這種情況[Kuang])變(Bian)壓器(Qi)比較小,設備沒有(You)開的時(Shi)分電[Dian]壓有400V,可是[Shi]設備一(Yi)開電壓就掉到350V,正常工作起來電壓(Ya)隻要360V,短期運用問[Wen]題不大,假設長時間(Jian)運用,勢必對電器系[Xi]統(Tong)構(Gou)成極大的損傷。
The additional working pressure of the general hill-opening air compressor is 380V, and the upper and lower promises to float at about 5%. The voltage mentioned here is the normal working voltage of the machine, because the transformer is relatively small on many construction sites (the factory voltage supply is relatively stable, generally does not have this situation) and the time voltage when the equipment is not open is 400 V, but when the equipment is open, the voltage drops to 350 V. The normal working voltage is only 360V. The short-term operation is not a big problem. Assuming long-term operation, it is bound to be applied to the electrical system. It constitutes great damage.
二、開山[Shan]空[Kong]壓機機組壓力逾越(Yue)額外壓力[Li]:
2. The pressure of the air compressor unit exceeds the additional pressure.
比如0.7MPa的機器,實踐壓[Ya]力抵達0.75MPa,就(Jiu)簡單出現(Xian)過[Guo]載現象。7公斤的空壓機不要調到[Dao]8公斤[Jin]用。榜首,平安得不到[Dao]保證,第二(Er),設備耐壓也不[Bu]行,壽數減短。所[Suo]以需求多大壓[Ya]力,就選購相對應壓力的[De]空壓機。
For example, when the practical pressure of a 0.7 MPa machine reaches 0.75 MPa, overload simply occurs. 7 kg air compressor should not be adjusted to 8 kg. No. 1, safety is not guaranteed. Secondly, the equipment can not withstand voltage and the life is shortened. So as much pressure as the demand is, choose the air compressor with the corresponding pressure.
三、接線松動:
3. Loose wiring:
查看輸入螺杆[Gan]空壓機電源線能否有發熱[Re]燒焦的痕迹,首要[Yao]查看一(Yi)下三相電壓[Ya]線,若[Ruo]有松動[Dong]或短路情況,那麼給予重接[Jie]就好了。
To check whether the power supply line of the input screw air compressor has traces of heating and scorching, the first thing is to check the three-phase voltage line. If there is loosening or short circuit, then it is better to reconnect.
四[Si]、開山(Shan)空壓[Ya]機接觸器[Qi]毛病[Bing]:
4. Contactor faults of mountain air compressor:
接觸(Chu)器裡[Li]邊的觸頭老化[Hua],吸合不良,接觸(Chu)面就(Jiu)小,電[Dian]流就(Jiu)大了,空壓機過(Guo)載是(Shi)小事,電氣(Qi)系統焚毀才是[Shi]我們[Men]不願意看到的工作。
Contacts inside the contactor aging, poor suction, contact surface is small, the current is large, air compressor overload is a trivial matter, electrical system burning is the work we do not want to see.
五、開山空壓機油氣[Qi]别離芯堵塞:
5. Blockage of oil and gas separated from core in mountain air compressor:
油分芯(Xin)堵塞,内壓高了,負載大了,電流就高了,所(Suo)以會過載。誤區:不要[Yao]認為新換沒多久的[De]東西[Xi]就不堵,現場(Chang)環(Huan)境髒,油氣(Qi)桶裡(Li)邊雜質多都簡單使油分[Fen]芯堵塞。新(Xin)換的油分(Fen)芯,環境也還(Hai)能夠,可是工[Gong]作200小時又堵塞了,這(Zhe)是和油分芯質[Zhi]量有聯系的。
The oil core is blocked, the internal pressure is high, the load is large, the current is high, so it will overload. Misconception: Do not think that new things will not be blocked soon, the site environment is dirty, and many impurities in the oil and gas barrel simply make the oil core separation blocked. The new oil core separation, the environment is also possible, but the work of 200 hours and blocked, which is related to the quality of oil core separation.
報錯
The operators of Kaishan Air Compressor must have encountered the problem of the main engine or motor overload and shutdown. Don't worry, Anshan Xingsheng Air Compressor Co., Ltd. will share your worries and solve your difficulties.
一[Yi]、電[Dian]壓太低:
First, the voltage is too low:
一般的開山空壓[Ya]機額外工作(Zuo)壓力[Li]為380V,上下答應(Ying)起浮在[Zai]5%左右。這裡(Li)所說的電壓是機器正常工(Gong)作(Zuo)的電壓,因為許多工地上(工廠(Chang)電壓供給[Gei]比較(Jiao)安(An)穩一般不會[Hui]有這種情況[Kuang])變(Bian)壓器(Qi)比較小,設備沒有(You)開的時(Shi)分電[Dian]壓有400V,可是[Shi]設備一(Yi)開電壓就掉到350V,正常工作起來電壓(Ya)隻要360V,短期運用問[Wen]題不大,假設長時間(Jian)運用,勢必對電器系[Xi]統(Tong)構(Gou)成極大的損傷。
The additional working pressure of the general hill-opening air compressor is 380V, and the upper and lower promises to float at about 5%. The voltage mentioned here is the normal working voltage of the machine, because the transformer is relatively small on many construction sites (the factory voltage supply is relatively stable, generally does not have this situation) and the time voltage when the equipment is not open is 400 V, but when the equipment is open, the voltage drops to 350 V. The normal working voltage is only 360V. The short-term operation is not a big problem. Assuming long-term operation, it is bound to be applied to the electrical system. It constitutes great damage.
二、開山[Shan]空[Kong]壓機機組壓力逾越(Yue)額外壓力[Li]:
2. The pressure of the air compressor unit exceeds the additional pressure.
比如0.7MPa的機器,實踐壓[Ya]力抵達0.75MPa,就(Jiu)簡單出現(Xian)過[Guo]載現象。7公斤的空壓機不要調到[Dao]8公斤[Jin]用。榜首,平安得不到[Dao]保證,第二(Er),設備耐壓也不[Bu]行,壽數減短。所[Suo]以需求多大壓[Ya]力,就選購相對應壓力的[De]空壓機。
For example, when the practical pressure of a 0.7 MPa machine reaches 0.75 MPa, overload simply occurs. 7 kg air compressor should not be adjusted to 8 kg. No. 1, safety is not guaranteed. Secondly, the equipment can not withstand voltage and the life is shortened. So as much pressure as the demand is, choose the air compressor with the corresponding pressure.
三、接線松動:
3. Loose wiring:
查看輸入螺杆[Gan]空壓機電源線能否有發熱[Re]燒焦的痕迹,首要[Yao]查看一(Yi)下三相電壓[Ya]線,若[Ruo]有松動[Dong]或短路情況,那麼給予重接[Jie]就好了。
To check whether the power supply line of the input screw air compressor has traces of heating and scorching, the first thing is to check the three-phase voltage line. If there is loosening or short circuit, then it is better to reconnect.
四[Si]、開山(Shan)空壓[Ya]機接觸器[Qi]毛病[Bing]:
4. Contactor faults of mountain air compressor:
接觸(Chu)器裡[Li]邊的觸頭老化[Hua],吸合不良,接觸(Chu)面就(Jiu)小,電[Dian]流就(Jiu)大了,空壓機過(Guo)載是(Shi)小事,電氣(Qi)系統焚毀才是[Shi]我們[Men]不願意看到的工作。
Contacts inside the contactor aging, poor suction, contact surface is small, the current is large, air compressor overload is a trivial matter, electrical system burning is the work we do not want to see.
五、開山空壓機油氣[Qi]别離芯堵塞:
5. Blockage of oil and gas separated from core in mountain air compressor:
油分芯(Xin)堵塞,内壓高了,負載大了,電流就高了,所(Suo)以會過載。誤區:不要[Yao]認為新換沒多久的[De]東西[Xi]就不堵,現場(Chang)環(Huan)境髒,油氣(Qi)桶裡(Li)邊雜質多都簡單使油分[Fen]芯堵塞。新(Xin)換的油分(Fen)芯,環境也還(Hai)能夠,可是工[Gong]作200小時又堵塞了,這(Zhe)是和油分芯質[Zhi]量有聯系的。
The oil core is blocked, the internal pressure is high, the load is large, the current is high, so it will overload. Misconception: Do not think that new things will not be blocked soon, the site environment is dirty, and many impurities in the oil and gas barrel simply make the oil core separation blocked. The new oil core separation, the environment is also possible, but the work of 200 hours and blocked, which is related to the quality of oil core separation.